Works Summary
Construction of the entire 2100m length of Wandin Creek Road, Wandin East. The scope of construction is from Beenak Road south to Monbulk-Seville Road.
The road had been designed to be an asphalt seal with the use of the existing open drainage. The road width will generally have a 5-metre wide trafficable seal with localised road widenings at bends.
The road width will generally follow the existing road formation and look to minimise the removal of existing vegetation. The road is crowned in the middle, allowing stormwater to sheet flow to either side of the road and into the existing open drainage infrastructure.
Disturbed sections of private driveways will be reinstated to the same standard as they existed prior to the works with use of the same surface material.Project timeline
-
Timeline item 1 - complete
Landowner consultation
- Questionnaire sent to all landowners affected to gauge your support for proposal.
- Special Charge Scheme road construction projects only proceed where both Council and a majority of landowners are supportive of the proposal.
Landowner survey complete.
-
Timeline item 2 - complete
Design
- Council’s Project Engineer will coordinate feature survey and design
-
Timeline item 3 - complete
Landowner briefing
- Accessible online via Council’s website.
- Invitation letter sent to landowners
- The briefing will outline design and Special Charge Scheme Statutory process.
-
Timeline item 4 - complete
Intent to levy
- Report to Council 14 September 2021 View agenda & minutes
- Intent to Levy Notice sent to landowners. View the Intent to Levy Public Notice
- Landowners may submit formal submissions
- Review of submissions
- Report to Council with submissions 23 November 2021 View agenda & minutes
-
Timeline item 5 - complete
Declaration
- Declaration of Special Charge Scheme Notice sent to landowners
- Landowners may apply for Council’s Declaration of the Special Charge to be reviewed at VCAT
- If no appeals to VCAT the project will be tendered
- If an appeal is lodged at VCAT the project will be put on hold until a written decision has been made
-
Timeline item 6 - complete
Construction
- Contractor engaged via tender
- Notification of works commencement letter sent to landowners
- Works complete
-
Timeline item 7 - incomplete
Final Cost
- Final costs of project reported to Council
- Letter sent to landowners to notify final cost